Cabin Build on Marmot Way

Site #66 - Last Update: Sep-14 15:54

42 marmot way box #1322
Telluride, CO, 81435-1322

Links

Inspections

General HOA Links

Permits

Next Steps

  1. Site Ground Prep
  2. Foundation and Concrete
  3. Pipe Materials for Heat
  4. Joists
  5. Warmboard Floor
  6. Place House

Recent Developments

  1. Driveway
    1. 4" conduit buried to 200', inspection with SM power passed, able to be covered
    2. Temporary power box installed, pending inspection
    3. driveway work
    4. site prep

Cabin Plans

cabin plan

(2020-09-14) Site/Driveway Plan

Sept 14 Updated Driveway Plan

(2020-09-14) Site/Driveway Plan OWTS (onsite wastewater treatment) Approved

Sept 14 Updated Driveway Plan OWTS