Cabin Build on Marmot Way
Site #66 - Last Update: Jan-18
42 marmot way box #1322
Telluride, CO, 81435-1322
Latest Image
Upcoming Inspections
- Framing
- Final Roof
- Fireplace Framing
- Chimney/Fireplace Flue
- Insulation
- Interior Wall Covering
- Floor/Deck Waterproofing
- Shower Pan
- High Altitude Adjustment
- Final Smoke/CO
- Final Mechanical
- Final
- Water-resistive Barrier (House Wrap)
- Interior Shear
- Exterior Shear
- Flue Pressure Test (Sealed Combustion)
- Slab Insulation
- Slab Rebar
- Hydronic Tubing
- Rough Smoke/CO
Completed Inspections
- Rough-in Driveway
- Ufer ( Concrete-Encased Grounding Electrode)
- Footings
- Foundation Wall
- Pier
- Foundation Waterproofing
- Perimeter Drain
- Rough Radon
- Foundation Insulation
- Roof Underlayment
General HOA Links
Cabin Plans
Framing Plan
(2020-09-14) Site/Driveway Plan
(2020-09-14) Site/Driveway Plan OWTS (onsite wastewater treatment) Approved